CREATIVE TECHNOLOGYEnergy & sustainability exclusive

PROPOSED PROJECT

Solar Performance Monitor

Give solar operators a daily view of arrays producing less than expected. Compare inverter readings with weather, site history, and maintenance logs, then rank unusual drops with supporting charts and possible explanations for an engineer to investigate.

SOLAR OUTPUT / INVESTIGATION 014

The sun stayed up. One reading dropped.

Illustrative hourly records
10:00–16:00 / same site

Energy per hourly interval / kWh
10h11h12h13h14h15h
ExpectedObserved
Fictional meter and baseline records. Expected output is illustrative; the gap is not recovered energy. Each hour label is the start of a one-hour interval. The chart compares the same site and window.

Find the interval.
Then inspect the evidence.

A fictional six-hour window has 1,200 kWh expected output and 906 kWh recorded output, a 294 kWh difference. Inverter B records zero in the two midday intervals while A continues producing. The maintenance log has an inspection scheduled later, but no confirmed outage explaining those readings. An engineer must distinguish a real stop from a reporting problem.

WHAT IS USUALLY DONE

An operator checks daily totals across dashboards and maintenance notes. A cloudy day can hide a equipment-specific drop, while a missing reading may be mistaken for zero output. Engineers spend time aligning intervals and deciding which difference deserves attention.

WHAT SOVRUN CAN DO FOR YOU

Sovrun would build a daily review that aligns inverter readings, weather, site history, and maintenance records. It compares actual output with a documented expected range, separates missing readings from measured zero, and ranks unusual differences with supporting charts. Engineers see possible explanations and the evidence still needed before deciding on an inspection or maintenance action.

Two zero readings.
Several possible explanations.

Inverter A continues producing while B reports zero at noon and 13:00. A missing record would be labeled missing, not zero. The engineer still needs the device status and logger evidence to determine what actually happened.

10:00–11:00
A60 kWh
B60 kWh

Readings received

11:00–12:00
A119 kWh
B119 kWh

Readings received

12:00–13:00
A150 kWh
B0 kWh

Recorded zero / investigate

13:00–14:00
A140 kWh
B0 kWh

Recorded zero / investigate

14:00–15:00
A99 kWh
B99 kWh

Readings received

15:00–16:00
A30 kWh
B30 kWh

Readings received

MAINTENANCE LOG / ML-014

Inspection scheduled at 13:30. No confirmed outage entry explains the earlier zero. Check the equipment status, logger, and actual work record before calling this a hardware fault.

A focused investigation.
Evidence an engineer can use.

The first build joins one defined group of inverters with its weather and maintenance records. Alerts guide a review; operating decisions remain with the site team.

Energy per hourly interval / kWh
10h11h12h13h14h15h
ExpectedObserved

10:00–16:00 / 294 kWh difference

01 / An aligned output reportExpected and observed energy share the same equipment, units, intervals, and source period.
INVERTER B / 12:00–14:00

Zero is a record.

Readings
0 kWh / 0 kWh
Data state
Received, not missing
Cause
Unconfirmed
Next check
Device + logger status
02 / An equipment-level findingThe flagged interval links to actual readings and retains the difference between zero and missing data.
INV-014 / ENGINEER REVIEW

Check before diagnosing.

Evidence
Intervals + ML-014
Owner
Site engineer
Action
Inspection to approve
Recovered energy
Not established
03 / A reviewed investigation handoffAn engineer receives the evidence, open questions, and follow-up record without an automatic equipment action.

How we’d make it happen.

  1. Align the records

    Confirm time zones, intervals, units, and equipment identifiers. Separate zero readings, missing data, and known outages before comparing output.

  2. Find the unusual differences

    Compare observed output with the agreed baseline and inspect the equipment-level pattern. Attach weather context and maintenance notes without assuming a cause.

  3. Review and learn from the finding

    An engineer approves the next investigation. Preserve the original alert and compare later evidence with the initial explanation.

Where AI helps

Time-series models estimate expected output using the agreed weather and history inputs. Language models summarize linked maintenance records and draft investigation notes. Code checks timestamps, units, and totals. A flagged difference is not a fault diagnosis; expected output needs validation on the actual site.

What people approve

Engineers approve the baseline, review data quality, confirm known outages and site constraints, and decide which checks are appropriate. Maintenance actions remain with authorized staff. The tool does not remotely operate equipment or promise recovery of all modeled output differences.

What we’d need to start

  • Timestamped inverter output, meter definitions, and explicit missing-data markers
  • Relevant weather records, site configuration, historical output, and maintenance logs
  • Engineer-approved comparison method, alert criteria, and review workflow

How we’d test it

Backtest on held-out site periods with known weather changes, outages, sensor gaps, and normal operation. Check false alerts, missed events, interval alignment, and expected-range accuracy. Evaluate follow-up outcomes separately; modeled output differences are not recovered energy.

Prepared for Energy & sustainability. We would agree on the work after reviewing your brief, materials, and requirements.

DISCUSS THIS PROJECT

This is a proposed project, not completed client work. The visuals and numbers show example outputs, not measured results.